Friday 31 May 2019

Registration for COE-Surat Training(SEM 7 ONLY)

Note: Deadline for COE,Surat training registration is 01/6/19. So make sure to register as early as possible. In case if less entries entire training will be cancelled. So inform your colleagues to register fast. Only 15 students have registered so far till 31/5/19 morning. This is golden opportunity for free certificate based training which can enhance your CV for future placements.
Training at Centre of Excellence-Surat is tentatively planned between 10/6/19 to 14/6/19 for Sem-7 students for following topics. (Only for SEM-7)

(1) Basic of LVSG (Maximum strength from ELECT/EC -24)
(2) Basic of PLC (Maximum strength from ELECT/EC -40)
(3) Basic of Process Instrumentation (Maximum strength from ELECT/EC -24)
Interested Students are informed to get register on or before 01/6/19. Students will be shortlisted on the basis of first cum first basis.


Register Here

Wednesday 29 May 2019

Registration for GET position at Welspun Ltd. (Only for current 8th sem batch)



(Only for current 8th sem batch)
There are requirements for recruiting fresher’s, for Steel Business at Welspun Steel Ltd, situated at Anjar and RMG Alloy Steel Ltd situated at Jhagadia, Bharuch.
Interested students shall register on or before 30/5/19 (9.00 a.m morning)
They are looking for following :
1.       GET’s around 2 nos  Mechanical Background
2.       GET’s around 1 nos  Electrical Automation/Instrumentation Background
3.       GET’s around 2 nos  Metallurgy Background
Criteria: 
Graduate Engineering Trainee
SSC- 60% passing
HSC- 60% passing
Backlog- 0 in final semester or can allow 1 backlog, which needs to be cleared before final results.
CTC- Offering
CTC - 3 .0 lakhs p.a.

Registration as an Apprentice Engineer at UPL Ltd (8th sem only)


It is only or Current Final Year 8th SEM Batch

There has been requirement of Apprentice Engineer at UPL Ltd.(Jaghadia) as per following details.


  
Eligibility
Score
10th and 12th
Above 60 %
Graduation
Above 55 %





Stipend: 12000/p.m
No travelling and Canteen facility. Upon request travelling facility may be considered at less rates.

Register Here

Deadline to register is up to Friday 31/5/19, 9.00 a.m

Vacancy is only 1 for electrical at present.


Friday 24 May 2019

Registration for probable pool campus of HFFC at SCET,Surat



HFFC is  looking forward to hire Engineering Graduates & other Graduates (can be from any streams) for 2019 passing out batch to join as Graduate Management Associate (GMA) Sales / Service.
There will be pool campus at SCET, Surat soon for the same.  Interested students can register on or before 24 may 2019, 10.00 p.m(night).


(Note: Write NIL or 0 in work experience text box while filling form.)

Wednesday 15 May 2019

GNFC Pool campus drive for 2019 pass out

GNFC is planning for pool campus recruitment drive of GET ( On Contract) for 2019 pass out batch and for the same LD engineering college is working as a nodal point.

Position: Graduate Engineer - Trainee (On Contract)

- The candidate selected shall be taken on One Year intensive training.

- Based on the performance of the candidates in the training period & requirement of Company,
  Company may consider for the further contract of Two years (i.e Engineer - On Contract)

- Upon completion of total 3 years (i.e 1-year training and 2 years contract), based on the
 performance of the candidate during the contract period & requirement of the company, further
decision shall be taken for the conclusion of contract / new contract.

ELIGIBILITY CRITERIA

1. The eligibility criteria for students (Whose placement is not done so far) appearing in
the selection process is as under:


  • The student must have passed Engineering Degree with First class in Year - 2019.
  • There must not be any LIVE BACKLOG (Current Backlog) at the time of recruitment/selection
  • The student must have with First Class in Engineering Degree as per respective University standard



Registration link for the same is mentioned below

Please fill out this registration till 16 May 2019

Fill your CPI of the latest semester up to two Digit Decimal point precisely (e.g. 8.40, not 8.4)

Link for Registration:

https://forms.gle/Uu8BRSXnhXHF4HaL9

Wednesday 8 May 2019

Registeration for AXTEL Industries Ltd,Halol (Current Final Year)



AXTEL Industries Ltd,Halol  would like to recruit the Students from Mechanical Engineering, Electrical Engineering & Chemical Engineering discipline. For the same, interested and eligible students who meets the following criteria can register on or before 09/05/19.
Criteria:
1)      SSC- 1st Class & above
2)      HSC- 1st Class & above
3)    Diploma – 1st Class in all Semesters
4)      BE- (Aggregate till 7th Semesters) - 1st Class & above
5)      No backlogs in any semester.
Kindly provide the below mentioned details of the Candidates who would be interested for Axtel:-
1)      Present Location & Native Location
2)      Willingness to relocate to Vadodara (Yes / No)
3)      Willingness to work in any department (related to their discipline).
Package will be Rs. 3.60 Lakhs/Annum.
Enclosed Company Profile for your reference & also you may visit our website (www.axtelindia.com) to know more about our organization.

Register Here

Electrical Power Generation (2140908) questions for Chapters-7,9,10,11,12

Notice: For remaining chapters please go through the question bank uploaded earlier.

Sr no
Chapter-7- Tariff and Economic aspects in power Generation:
1.)
The annual consumption of domestic customer is 1500000 units and annual load factor is 40%. What will be the saving in the average unit cost, if the load factor improves to 100%? Consider two part tariff : Rs. 500 per kW of maximum demand per year + Rs. 0.40 per kWh.
2.)
Define (i) Connected load (ii) Plant capacity factor (iii) Diversity factor (iv) Maximum load (v) Plant use factor (vi) Base load (vii) Peak load
3.)
A power station is to supply three industrial loads- whose peak loads are 50 MW,40 MW and 30 MW. The annual load factor is 0.65 and diversity factor is 1.75. Estimate the following.
(i) Maximum demand on the plant
(ii) Average load
(iii) Annual energy generated
4.)
Determine load factor at which the cost of supplying a unit of electricity from a Diesel and from a Steam station is same if the annual fixed and running charges are as follows :
Diesel Fixed Rs. 300/kW Running Rs. 0.25/kWh
Steam Fixed Rs. 1200/kW Running Rs. 6.25/kWh
5.)
Enlist different types tarrif and explain any three types of tariff.
6.)
Write different types tariff and explain three part tariff.

Chapter-9- Photovoltaic Power Conversion systems:
1.)
Explain working principle of solar photovoltaic cell.
2.)
Draw and explain the I-V and P-V characteristics of solar photovoltaic cell.
3.)
Explain construction and working of solar distillation unit with suitable figure.
4.)
Define solar cell and solar array.
5.)
Explain concept of green building using solar energy.
6.)
Explain construction & working of solar refrigeration plant with suitable figure
7.)
Explain Pyranometer with diagram.
8)
Describe with the help of a neat sketch the working of solar power plant. What are its salient features?
9)
Explain present status of photovoltaic system in Gujarat and India.
10)
Discuss the applications of solar energy.

Chapter-10- Wind Power Conversion System:
1.)
Derive equation for maximum power of wind turbine.
2.)
Explain in brief geared, direct drive and hybrid Wind Power Plant and give their comparison.
3.)
Differentiate between Horizontal and Vertical Axis Wind Turbine.
4.)
Explain construction and working of DFIG.
5.)
Derive the equation for available wind power in terms of velocity of wind and diameter of turbine rotor.
6.)
Explain various components of wind energy conversion system with diagram.
7)
Explain basic principle of wind energy generation.
8)
Explain advantages and disadvantages of wind energy.
9)
Discuss the points and write the methods of site selection for locating the wind mills
10)
Define power coefficient, tip speed ratio and solidity. Discuss their effect on performance of wind turbine.
11)
What are the major components of wind energy conversion systems?

Chapter-11- Substation:
1.)
Enlist various equipments used in substation.
2.)
Draw and explain pole mounted substation with suitable figure.
3.)
Explain arc suppression coil earthing in detail.
4.)
What is a transformer sub-station? What are the different types of transformer sub-stations? Illustrate your answer with a suitable block diagram.
5)
Draw a neat layout of a 132/33 KV substation having two 132 KV incoming line & four 33 KV out going lines. Show essential equipments in the diagram

Chapter-12- Neutral Earthing:
1.)
Explain reactance earthing in detail.
2.)
Explain arc suppression coil earthing in detail.
3.)
What is Neutral Grounding? List the advantages of Neutral Grounding.
4.)
Why is neutral earthing necessary in power system? How can it be classified?
5)
Explain (i) Solid earthing (ii) Peterson coil earthing.
6)
Explain voltage transformer earthing.


Digital electronics-(2140910) questions for chapter-5,6 and 7

Notice: For chapter-1,2,3 &4 please go through question bank uploaded earlier.

CHAPTER 5:
FLIP FLOPS AND SEQUENTIAL LOGIC AND CIRCUITS
61 Distinguish between combinational and sequential logic circuits.
62 Explain SR flip-flop.
63 Discuss application of flip flops.
64 Explain D-Flip-flop.
65 Explain T-Flip-flop.
66 Differentiate between excitation table and truth table. Write excitation table for J-K flip flop.
67 What is positive and negative edge triggering? Explain SR flip flop with negative edge triggering
68 State the basic difference between synchronous and asynchronous counters.
69 Explain operation of 4 bit left shift register with necessary diagrams.
70 Differentiate between level triggering and edge triggering of flip-flops. Explain Master-Slave J-K flip-flop
configuration.explain race aound condition.
71 Design mod -12 asynchronous up counter.
72 What are Preset and Clear inputs with flipflop? Why are they provided with flipflop?
73 Design 4-bit up/down ripple counter.
CHAPTER 6: MEMORY
74 Write a note on EEPROM.
75 Compare between various types of ROM.
76 Explain internal organization of RAM , Draw and explain with necessary block diagram the process of writing in
memory and reading from memory also.
77 Give comparison between EPROM and FLASH memory.
78 Compare SRAM with DRAM.
79 Give internal organization of 16×4 RAM. Explain Read and Write operation of RAM.
CHAPTER 7:D/A AND A/D CONVERTER
80 Compare various D/A Converters
81 Describe operation of D/A converter with binary weighted resistors.
82 Define following specifications of DAC (i) Resolution (ii) Accuracy (iii) Settling time (iv) Monotonicity.
83 Define following specification of ADC (i) Resolution (ii) Conversion time (iii) Quantization error
84 Explain working of successive approximation type ADC.
85 Explain R-2R ladder DAC with necessary diagram.
86 Mention the applications of D/A converter and A/D converter.

Registration for Torrent(B.E Electrical, Final Year Current batch only) URGENT


There will be pool campus recruitment process by Torrent Power Ltd for  B.E/B.Tech Electrical Students in nearby future. Interested current final year students can register for the same strictly on or before 11.30 a.m, 09/05/19. Data has to be sent by tomorrow afternoon.
Note: Those who have paid placement fees can only register for the same. Students with no backlog record in any semester can only register. Make sure to see eligibility criteria strictly before registration. Those who are willing to work outside Gujarat shall only register.  
Please find below the details.
Eligibility Criteria :
2018-2019 students pursuing degree from Electrical stream will be eligible.
Selected students will be posted at any of our location  Bhiwandi / Shil / Mumbra / Kalwa as per company requirements.
Qualification
Eligibility Criteria
SSC
Min 70 %
HSC & Diploma (if applicable)
BE/B.Tech Electrical (Full time)
Min. 60 % aggregate
ATKTs in B.E ( All Semesters)
No ATKT is allowed ( Live or Dead )



CLICK HERE FOR REGISTRATION